ENGINEERING - PROJECTS - SALVADOR CAETANO STAND

Location: Sintra, Portugal

Phase: Completed 2003

Size: 5640 m2

Design: HVAC Design and Thermal Studies

HVAC systems have been adopted in order to ensure ventilation, air conditioning and air treatment of the building. The thermal studies ensure that solutions are thermally efficient in order to respect the environment. The thermal studies were fundamental in advising the architect in selecting the passive solutions to improve comfort and energy efficiency.

stand salvador caetano 01 stand salvador caetano 02
stand salvador caetano 03 stand salvador caetano 04